
Warren Woods Tower High School- June 20, 2007
View of heating coil being removed from the Tower air handling unit 18, as part of the refurbishment process. This refurbishment will involve replacing coils, dampers, belts and sheaves along with cleaning and refurbishing the unit. Newly installed variable frequency drive pictured to the left.

Warren Woods Tower High School- June 20, 2007
View of the Tower air handling unit 16, showing the section were the heating coils were removed.
Warren Woods Tower High School- June 20, 2007
Variable frequency drives installed for the Tower air handling unit 19. These drives will control the speed of the supply and return fans as required to help conserve energy.
Warren Woods Tower High School- June 20, 2007
The demolition of the chiller for Tower has started. It will be cut into several smaller pieces to ease the removal from the boiler room.
Warren Woods Tower High School- June 20, 2007
New Tower front doors (facing Bunert) are shown installed as part of the replacement of all the exterior doors.
©Warren Woods Public Schools 2007