The following are the pictures taken to show progress status as of May 22.

Warren Woods Tower High School- May 23, 2007
View of Danfoss valve installed for Tower perimeter radiation heaters.

Warren Woods Tower High School- May 23, 2007
Piping fabricated onsite for the Tower boiler installation.

Warren Woods Tower High School- May 23, 2007
Concrete pad & equipment for Tower pool heater installation.

Warren Woods Tower High School- May 23, 2007
Rack installed for Tower pool heat exchanger.

Warren Woods Tower High School- May 23, 2007
Workers installing pipe fittings for the Tower boiler pumps.