

Warren Woods-Tower High School- May 24, 2006
The food service equipment in the Concessions Room is being installed. The
Rolling Shutter has also been installed and will have power run to it shortly.
The Concessions Room will house the equipment to serve the food such as the
popcorn maker, pretzel warmer, beverage cooler to name a few.

Warren Woods-Tower High School- May 24, 2006
The interior of the Lobby is being drywalled. After drywalling, it will be
painted and flooring will be installed. The skylight structural steel will also
be painted.

Warren Woods-Tower High School- May 24, 2006
Another view of the interior Lobby.

Warren Woods-Tower High School- May 24, 2006
The food service equipment is also being set in the Storage Room which is
connected to the Concessions Room via door. This Storage Room will house the
equipment needed to store the food such as the refrigerators and sinks.
©Warren Woods Public Schools 2006