Briarwood Elementary - June 22, 2005
A temporary office has been built in the existing gymnasium for the Principal as the current front office is being remodeled.

Briarwood Elementary - June 22, 2005
Classroom demolition is nearly complete on the east side of the building. This photo shows classrooms 164 and 168. A new masonry wall is going to be built where the ladder is to separate the classrooms.

Briarwood Elementary - June 22, 2005
New ductwork is being installed in the classrooms. This ductwork will be connected to the new vertical unit ventilators (VUV’s) which will provide an even distribution of heating and cooling throughout the room.

Briarwood Elementary - June 22, 2005
The media center demolition is underway. This photo is taken from the end of the main corridor looking south. When construction is complete, this view will be through a window into the new computer alcove with the enlarged media center behind it.

Briarwood Elementary - June 22, 2005
This is another photo of the media center demo. Photo is taken from east corridor looking west.

Briarwood Elementary - June 22, 2005
Shingle replacement has started. The shingles have removed from the north face of the existing gym roof.