

A view of the corridor before it is tiled. The lockers are complete (with the exception of the green door on the right of the picture), ceiling tile and lights are in. The drinking fountains have yet to be installed. Window shades are being installed.

The girls toilet room is tiled and awaiting toilet accessories, fixtures and partitions.

A view of the POHI Toilet picture’s shower. A shower seat has yet to be installed.

The POHI Unisex toilet room has been tiled and toilet accessories are on their way.
©Warren Woods Public Schools 2007