

The carpet has been laid in the 700 wing Chris Clark Computer Lab.

The ceiling grid is up and ceiling tiles are being dropped around the perimeter of the rooms.

Wood Doors are being hung throughout the 700 wing. Vinyl wall base will be installed at a later date.
©Warren Woods Public Schools 2007