A view standing in Art 1 looking towards Art 2. The masonry wall on the left is a Storage Room; next to that Storage Room is the kiln room. The plywood on the floor is covering the concrete that was sawcut to install a sanitary line for the (2) new Art Room sinks.

The walls for the new 700 wing Custodian Closet are complete. For a reference, these are the first walls that will be seen walking into the 700 wing.

The masonry wall separating the boys and girls toilet rooms in the 700 wing was being built at the time the picture was taken.