The mason continues to build masonry walls throughout the 500 wing.

The walls have been painted in the boys locker room and lights are being installed. The same work is progressing in the girls locker room.

Floor tile is being laid in the toilet rooms to receive new tile.

The wolverine logo in the gymnasium was started last night. The logo will be mirrored on the opposite wall also.