

September 29, 2007
The individual classroom unit ventilators are still being set and connected. The soffit going across the ceiling contains the ductwork running from the unit ventilators.

September 29, 2007
The windows on the north side of the building are being set.

September 29, 2007
The screen wall has been built in the Boys Locker Room. Inside the room as well as the girls locker room, drywall ceilings are being finished.
©Warren Woods Public Schools 2007