Here are this weeks progress photos for Warren Woods Middle School:

March 2, 2007

The exterior hollow metal doors are being installed.

March 2, 2007

The lay-in light fixtures are being installed throughout.

March 2, 2007

The reception desk has been installed and the vertical surfaces protected. The mailbox has also been installed. Carpet is scheduled to begin the end of the month.

March 2, 2007

The aluminum windows are also being installed.

 