Here are this weeks progress photos for Warren Woods Middle School:

March 2, 2007
The exterior hollow metal doors are being installed.

March 2, 2007
The lay-in light fixtures are being installed throughout.

March 2, 2007
The reception desk has been installed and the vertical surfaces protected. The mailbox has also been installed. Carpet is scheduled to begin the end of the month.

March 2, 2007
The aluminum windows are also being installed.