

March 21, 2007
Metal studs and drywall in the Electrical Room in D-Wing.

March 21, 2007
Metal stud walls and burnished block column enclosure in the new Administration Area in D-wing.

March 21, 2007
All walls have been demolished for the Pool Building.

March 21, 2007
Prime paint on new masonry walls in the corridor of D-Wing.
©Warren Woods Public Schools 2007