Briarwood Elementary - December 8, 2005

The Art Room has received ceiling grid and light fixture installation is underway.  Once all above ceiling work is complete, the flooring will be installed.


Briarwood Elementary - December 8, 2005

Light fixtures are being installed above the stage. The ceiling of the stage will be a painted exposed ceiling.


Briarwood Elementary - December 8, 2005

Construction in the TPC Room is underway.  Flooring has been installed and wiremold has been run along the wall.  This wiremold provides a finished look for the electrical and technology wiring feeding the room.  Ceiling grid and light fixtures have been installed.