March 7, 2007
Double door frames installed in new masonry at the end room of the D-Wing looking into the hallway

March 7, 2007
Rough mechanical and electrical in ceiling of the D-Wing.

March 7, 2007
New door frames and glass block side lite installed in new masonry walls.

March 7, 2007
East wall and ceiling have been demolished at the pool building and back fill is continuing.